Documents
As documents become available you will be able to view them here.
EPBC Documents for public notice
Original Referral
- EPBC Referral Application
- MNES Report – Body
- MNES Report – Appendix A (Part 1): Detailed and Targeted Flora
- MNES Report – Appendix A (Part 2): Detailed and Targeted Flora
- MNES Report – Appendix B: Basic and Targeted Fauna
- MNES Report – Appendix C: Targeted Fauna
- MNES Report – Appendix D: Preliminary BBAMP
- MNES Report – Appendix E: MNES Search
- MNES Report – Appendix F: Flora Likelihood
- MNES Report – Appendix G: Preliminary CEMP
- MNES Report – Appendix H: BBUS
- MNES Report – Appendix I: Impact Assessment
- Attachment 2: Neoen HSE Policy
- Attachment 3: Neoen Sustainability Framework
- Attachment 4: Lots and Plans in Project Area
- Attachment 5: Heritage Due Diligence Assessment
- Attachment 6: Yathroo Community Engagement Plan
Preliminary Documentation
- App A: Detailed and Targeted Flora and Vegetation Assessment
- App B: Basic and Targeted Fauna Assessment
- App C: Targeted Fauna Habitat Assessment
- App D: Preliminary BBAMP (V4)
- App E: Protected Matter Search Tool Results
- App F: Detailed Likelihood of Occurrence
- App G: Preliminary Construction Environmental Management Plan
- App H: Bird and Bat Utilisation Summary Report
- App I: Autumn 2026 BBUS Memo
- App I: Spring 2025 BBUS Memo
- App I: Summer 2026 BBUS Memo
- App J: Significant Impact Assessments
- App K: Yathroo Targeted Shorebird Report (V2)
- App L: Environment Offset Strategy (V1)
- App M: Yathroo Preliminary Decommissioning Plan (V3)
- App N: Full Bird and Bat List to May 2026
- Yathroo Wind Farm – Assessment of Impacts to MNES (June 2026) – Report Body